NCDOT NC 87 BRIDGE REPLACEMENTS

NCDOT Division 7, NC

Project Description
Summit is acting as the NCDOT Survey party on the NC87 Bridge Replacement project for construction layout services in NCDOT Division 7. The project consists of a detour with two temporary bridges, then demo and replacement of the existing two bridges. Summit is doing all construction layouts for the project including bridge layouts, slope staking, fine grading, and utility layouts.
Project Details
Related Projects

Aerial view of Monroe Expressway connection from US 74 near I-485 in Mecklenburg County to US 74 between Wingate and Marshville in Union County - Services provided include Construction Engineering and Inspection, Construction Materials Testing and Survey Verification.

Summit was selected by NCDOT as the prime consultant for the Monroe Expressway connection from US 74 near I-485 in Mecklenberg County to US 74 between Wingate and Marshville in Union County. Summit is providing NCDOT CEI, structures inspections and materials sampling and testing. For this project, Summit staffed one Resident Engineer, three assistant Resident Engineers and 34 technicians between our own and our sub-consultant’s employees. Summit also assisted with all testing and inspection for toll operations to begin once the road opened. Summit inspected all aspects for 7 ORT facilities and gantries for toll collections.

Bridge Coatings Inspections for the Biltmore Estates in Asheville, NC - Services provided include Industrial Bridge Coatings.

Summit is providing inspection services on a 12 bridge rehabilitation project for the Biltmore Estate. The rehabilitation project includes six of the structures on the estate itself and 6 other bridges in the vicinity. This project consists of granite stone removal on the Biltmore bridges, lead abatement, a new coating system, shotcrete repairs, joint replacements, deck overlays, and steel repairs.

Aerial of an NCDOT Division 7 On-Call project in Greensboro, NC that included stakeless fine grading verification - Services provided include Survey Verification and Construction Engineering and Inspection.

Summit is currently providing support to Resident Engineers in Division 7, in addition to our project specific Design-Build for the Greensboro Outer Loop. Digital Terrain Models are provided by the contractor and checked, verified and/or used for cross checks and stakeless fine grade verification.