NCDOT NC 87 Bridge
NCDOT Division 7, NC
Project Description
Summit is acting as the NCDOT Survey party on the NC87 Bridge Replacement project for construction layout services in NCDOT Division 7. The project consists of a detour with two temporary bridges, then demo and replacement of the existing two bridges. Summit is doing all construction layouts for the project including bridge layouts, slope staking, fine grading, and utility layouts.
Project Details