NCDOT NC 87 BRIDGE REPLACEMENTS

NCDOT Division 7, N.C.

PROJECT DESCRIPTION

We are acting as the NCDOT Survey party for construction layout services on the NC87 Bridge Replacement project in NCDOT Division 7. The project consists of a detour with two temporary bridges; then demo and replacement of the existing two bridges. We are performing all construction layouts for the project including bridge layouts, slope staking, fine grading and utility layouts.

We served as the prime consultant for the Monroe Expressway connection from US 74 in Mecklenburg County to US 74 in Union County. An 18-mile, completely electronic toll road, the Monroe Bypass was the largest NCDOT project in history when construction started.


Learn More

Our firm is currently providing support to Resident Engineers in Division 7, in addition to our project specific Design-Build. Digital Terrain Models are provided by the contractor and checked, verified and/or used for cross checks and stakeless fine grade verification.


Learn More

This $9 Million project involved full rehabilitation of 12 bridges on Interstate 40 as they cross the historic Biltmore Estate. Our team provided lead inspection services for the entire project as well as coatings and transportation inspectors.


Learn More