BILTMORE ESTATES BRIDGE COATING INSPECTIONS

Asheville, N.C.

PROJECT DESCRIPTION

This $9 Million project involved full rehabilitation of 12 bridges on Interstate 40 as they cross the historic Biltmore Estate. It required managed coordination between NCDOT and the private owners of Biltmore Estate, as well as adherence to historic registry guidelines. The contract involved the removal, cataloguing and reset of granite fascia, removal of existing lead-based coating and repainting of structures, extensive steel repairs, repairs to the concrete substructure and overlaying of the bridge decks. Our team provided lead inspection services for the entire project as well as multiple coatings and transportation inspectors.

We are providing industrial coatings and inspection services on a four-bridge rehabilitation project for the NC Department of Transportation. These four bridges are located throughout Smithfield, NC in NCDOT Division 4. This project consists of lead abatement, a new coating system, shotcrete repairs, joint replacements, deck overlays and steel repairs.


Learn More

We are acting as the NCDOT Survey party for construction layout services on the NC87 Bridge Replacement project in NCDOT Division 7. The project consists of a detour with two temporary bridges; then demo and replacement of the existing two bridges. We are performing all construction layouts for the project including bridge layouts, slope staking, fine grading and utility layouts.


Learn More

We provided both contract administration and inspection services on this municipal project. The original five-span Mickley Avenue bridge had significantly deteriorated after 95 years of use. The bridge also spanned over the Norfolk Southern Railroad which had future railroad track additions planned.


Learn More