BILTMORE ESTATES BRIDGE COATINGS INSPECTIONS

Asheville, NC

Project Description
Summit is providing inspection services on a 12 bridge rehabilitation project for the Biltmore Estate. The rehabilitation project will include six of the structures on the estate in total. This project consists of granite stone removal on the Biltmore bridges, lead abatement, a new coating system, shotcrete repairs, joint replacements, deck overlays, and steel repairs.
Project Details
Related Projects

Bridge rehabilitation for NCDOT Division 4 in Smithfield, NC - Services provided include Industrial Coatings.

Our industrial coatings team is providing inspection services on a four bridge rehabilitation project for the NC Department of Transportation. These four bridges are located throughout Smithfield, NC in NCDOT Division 4. This project consists of lead abatement, a new coating system, shotcrete repairs, joint replacements, deck overlays and steel repairs.

Bridge Rehabilitation in NCDOT Division 4 - Services provided include Survey Verification.

Summit is acting as the NCDOT Survey party on the NC87 Bridge Replacement project for construction layout services in NCDOT Division 7. The project consists of a detour with two temporary bridges, then demo and replacement of the existing two bridges. Summit is doing all construction layouts for the project including bridge layouts, slope staking, fine grading, and utility layouts.

Bridge demolition and replacement in Bessemer, NC - Services provided include construction engineering and inspection and construction management.

Summit provided both contract administration and inspection services on this municipal project. This project started with the demolition of a 95-year-old, fivespan bridge over the Norfolk Southern Railroad. A 150-foot, single-span structure was constructed to replace the deteriorated bridge and allow for future railroad track additions. We monitored all construction operations providing daily field reports; materials received reports and pay estimates, as well as sampling and testing of all materials in accordance with NCDOT requirements. Our contract administration duties included but were not limited to bid tabulations, facilitating project meetings, coordinating submittal distribution, monitoring DBE participation, change orders and pay application approval and processing.