MICKLEY AVENUE BRIDGE NO. 165

Bessemer City, NC

Project Description
Summit provided both contract administration and inspection services on this municipal project while utilizing ESP Associates, P.A. to provide materials sampling and testing. This project started with the demolition of a 95-year-old, fivespan bridge over the Norfolk Southern Railroad. A 150-foot, single-span structure was constructed to replace the deteriorated bridge and allow for future railroad track additions. We monitored all construction operations providing daily field reports; materials received reports and pay estimates, as well as sampling and testing of all materials in accordance with NCDOT requirements. Our contract administration duties included but were not limited to bid tabulations, facilitating project meetings, coordinating submittal distribution, monitoring DBE participation, change orders and pay application approval and processing.
Project Details
Related Projects

Construction Engineering and Inspection and Geotechnical Engineering for a 8.4 mile portion of Interstate 295, also known as The Fayetteville Outer Loop - Services provided include Construction Engineering and Inspection and Geotechnical Engineering.

The Fayetteville Outer Loop, also known as Interstate 295, is a 22.4-mile bypass. Summit was the prime Construction Engineering and Inspection firm representing NCDOT for this project. Summit supplied experienced, qualified and NCDOT-certified technicians with expertise in roadway and structure construction on an 8.4-mile portion of the loop. Construction materials testing and special inspection duties for this project included encompass grading, drainage, Y-line paving, noise walls, structure construction and contract administration. Summit also staffed an Assistant Resident Engineer to assist with project management. Summit’s staff provided oversight of all construction activities, coordinated technician/contractor inspection operations, monitored project progress and provided final documentation for project acceptance by NCDOT and FHWA.

Bridge Coatings Inspections for the Biltmore Estates in Asheville, NC - Services provided include Industrial Bridge Coatings.

Our Industrial Coatings department is providing inspection services on a 12 bridge rehabilitation project for the Biltmore Estate. The rehabilitation project includes six of the structures on the estate itself and 6 other bridges in the vicinity. This project consists of granite stone removal on the Biltmore bridges, lead abatement, a new coating system, shotcrete repairs, joint replacements, deck overlays, and steel repairs.

Surveying and Survey Verification services for 2 replacement bridges in NCDOT Division 7 - Services provided include Surveying and Survey Verification.

We are acting as the NCDOT Survey party on the NC87 Bridge Replacement project for construction layout services in NCDOT Division 7. The project consists of a detour with two temporary bridges, then demo and replacement of the existing two bridges. Summit is doing all construction layouts for the project including bridge layouts, slope staking, fine grading, and utility layouts.