Routine Maintenance Improvement Plan Assistance
Multiple Locations, NC

Highway Pipe Replacement

Project Description
Summit Design and Engineering Services, PLLC assists NCDOT with their Routine Maintenance Improvement Plan. This is a 3 to 5-year plan identifying specific highway maintenance needs based on budget, location, traffic volumes and other criteria. With these plans, NCDOT is able to provide long term maintenance cycles and budget forecasting needs. These plans also simplify the ability to incorporate service contracts for specific tasks such as ditching and pipe replacement as well as administration of such contracts.
Project Details